Harvest Road Sewer Replacement Project
The Harvest Road Sewer Replacement Project was the removal of 1,140 linear feet of existing 8-inch diameter sewer pipe and the installation of a new 12-inch diameter sewer pipe.
Location
Harvest Rd. and 202nd Street SE
Bothell, WA
Project Size
1,140 linear feet of sewer pipe
Value
$898,585
Engineer
Gray & Osborne Inc.
Client
Alderwood Water and Wastewater District
Status
Completed September 2017