Pioneer Highway Upgrades, Phase 1

The Pioneer Highway Upgrade, Phase 1 project consisted of installing approximately 1,640 linear feet of gravity sewer pipe to increase capacity within the 72nd Avenue Interceptor for planned future growth. Along with the installation of this 15-inch diameter sewer pipe was asphalt paving, erosion control, bypassing, and approximately 250 square feet of Pioneer Highway concrete paneling restoration.

Location
Pioneer Highway & 72nd Avenue
Stanwood, WA

Project Size
1,640 ln ft

Value
$597,600

Engineer
BHC Consultants

Client
City of Stanwood

Status
Completed October 2019